The current state of the construction works 29.07.2016

The current state of the construction works 29.07.2016

29.07.16
The current state of the construction works 27.07.2016

The current state of the construction works 27.07.2016

27.07.16

Works on the organization of temporary technological accession to power supply networks for installation and construction works are performed. Temporary accession will provide needs of object for electricity with power up to 100 kW. Length of the line of temporary accession makes 360 meters.

The current state of the construction works 24.07.2016

The current state of the construction works 24.07.2016

24.07.16
The current state of the construction works 15.07.2016

The current state of the construction works 15.07.2016

15.07.16
The current state of the construction works 08.07.2016

The current state of the construction works 08.07.2016

08.07.16
The current state of the construction works 01.07.2016

The current state of the construction works 01.07.2016

02.07.16
The current state of the construction works 24.06.2016

The current state of the construction works 24.06.2016

25.06.16

Works on dumping of a ditch and preparation of the pile field under the main process building «Plant growing sturgeons capacity of 250 tons / year of commercial products and 1.5 tons / year of caviar «BIOnika" LLC»»

The tender for performance of work on developments of the concept of design of the residence

The tender for performance of work on developments of the concept of design of the residence "PRESIDENT"

28.05.16

5.26.2016 years in property of the LLC Bionika company have been acquired the land plots with a total area of 30 Hectares located in one of ecologically purest regions of Chelyabinsk region on the bank of the lake "Bitter".

The current state of the construction works 27.05.2016

The current state of the construction works 27.05.2016

27.05.16

Closing stage of works on the organization of an access road to a site of building of object «Plant growing sturgeons capacity of 250 tons / year of commercial products and 1.5 tons / year of caviar «BIOnika" LLC»»

The current state of the construction works 13.05.2016

The current state of the construction works 13.05.2016

13.05.16

Works on removal of a fertile layer of earth under the organization of an access road are performed.