Today, 10/27/16, the utmost important event in the life of the project "Aquaculture BIOnika" was held. We celebrated the "laid of the coins" under the first two columns.
The current state of the construction works 27.07.2016
27.07.16
Works on the organization of temporary technological accession to power supply networks for installation and construction works are performed. Temporary accession will provide needs of object for electricity with power up to 100 kW. Length of the line of temporary accession makes 360 meters.